1. RR (P) of 5.77 km at different locations and TSR (P) of 10.50 km at different locations and other allied works and replacement of existing turnouts with fan shaped turnouts on SOG-APH section. Complete renewal of existing 52 kg/90 R 11.05.2006 DRM Bikaner, N.W. Railways 128-w/TC/06-07/24 dt11-5-06
2. Point&-Xing on ST/Wooden sleeper with 52 kg/60kg fan shaped turnout in the section of Se/P.way/NDLS. 05.10.2006 DRM New Delhi, Northern Railways 128-w/280/53/06-07/w3 dt 12-6-08
3. Provision of complete track renewal by PQRS on up line km. 1081.00 to km 1091.48 and km. 1092.50 to 1099.60=17.58 kms under ADEN/NCR/ETAWAH: tender opened on 7-5-2008. 2.5.08 Allahabad Division
Phaphoond Site
Letter No. 74-W/8005/Bills Dt. 26-9-2008
4. Laying And Linking Of Broad Guage Railway Track For The Main Line, Loop Line In Sections And Yards With Various Types Of Turnouts, Derailing, Switches, Switch Expansion Joints Including Leading And Spreading Of Track Ballast, Leading Of Various P.Way Materials And Other Allied Works In Connection With Aligarh-Ghaziabad 3rd Railway Line Project Of Rvnl Section Km 73.00 To Km 106.00 & Package E-3”-Letter Of Acceptance (Loa).Gaziyabad. 8.11.08 IRCON INTERNATION LTD. No. IRCON/1023/RVNL.AGRP/ RE-tender/linking/pkg-E-3 270/1870 Date 5-12-09
5. Carrying Of 52 Kg Single Rails By Trailer/Track From Baihata To Rowtabagan Station Between Rangiya-Rangapara North Section Under Dy. Ce/Con/Rny In Connection With Rangiya-Murkongselek Gauge Conversion Project. 30.12.08 RANGIYA Division No. W/362/CON/RNY/RPAN/2008/06/403 dt. 23.1.09
6. Various Base Depot/Site Activities For Pqrs With Ctr 29.99 Km. From 323.83 To 330.8, 331.50 To 335.15 On Bti-Fzr Section And Km. 21.12 To 32.18 & 39.56 To 47.87 On Kkp-Fka Section Under Aden-I/Fzr. 16.1.09 Ferozepur Division No. 770-W/169-WA-III/A 779/ADN/FZR dt. 16.3.09
7. Transportation Of PSC Sleepers For T/Out. SEJ Guard Rail, Main Line, Level Crossing Sleepers And Rails/Switches, Crossings Etc. Of Various Lengths From Different Places To Pandharpur-Miraj Section In Connection With Miraj-Latur Section GC Project. 12.12.08 Solapur Division No. Sur/W/CN/R-20 Dt 16.1.09
8. Laying And Linking Of BG Track In Pandharpur-Dhalgaon Section (Excluding Dhalgaon Yard) From Km. 429 To Km. 503 And Making The Same As LWR Track Including Insertion Of Glued Joints, SEJ, Providing Check/Guard Rails Wherever Required Assembly Of Turnouts On Formation, Providing And Fixing Curve/LWR Boards Etc. As Directed And As Per IRPWM With Latest Correction Slips In Connection With Miraj Latur Gauge Conversion Project. 10.2.09 Solapur Division No. UMD/W/CN/R-37 Dt. 14.5.09
9. Deep Screening & Through Rail Renewal Using BCM And Manual Method Including Cess/Formation And Misc. Work In PUNE-Lonavla Section. 27.2.09 Pune Division No. PA/WR/Deep Screening/LNL Dt. 24-4-09
10. Linking Of Track On PRC Sleepers 60 Kg/52 Kg Rails With 1660/1540 Density Per KM Including Dismantling Of Existing Track And In Connection With Doubling Of TUNDLA-YAMUNA Bridge Doubling Of Agra Division Of N.C.Railway. 23.4.09 AGRA Division No. CEN/MISC/CNB/115/08-09 DT. 1.6.09
11. Loading, Leading & Unloading & Their Staking Of Various P.Way Materials Between Tundla-Yamuna Bridge Section In Connection With Doubling Of Tundla-Yamuna Bridge Doubling Of Agra Division Of N.C. Railway. 23.4.09 AGRA Division No. CEN/Misc/CNB/08-09 Dt. 1-6-09
 